Skip to main content
IronKernel Platform

Tower: Yard Throughput and Shift Oversight (YMS)

Tracks yard throughput, capacity pressure, and shift handoff quality with KPI-grounded views.

Problem

Tracks yard throughput, capacity pressure, and shift handoff quality with KPI-grounded views.

Capability

Tracks yard throughput, capacity pressure, and shift handoff quality with KPI-grounded views.

How it works

  1. 1 Yard intelligence page for terminal throughput, dock utilization/congestion, detention hotspots, and multi-site KPI summary.
  2. 2 Shift handoff briefing surfaced from analytics contracts for incoming-supervisor review.
  3. 3 Dock handoff item visibility integrated for operational transitions.

Operational outcomes

  • Yard intelligence page for terminal throughput, dock utilization/congestion, detention hotspots, and multi-site KPI summary.
  • Shift handoff briefing surfaced from analytics contracts for incoming-supervisor review.
  • Dock handoff item visibility integrated for operational transitions.

Integration boundaries

  • TMS (Primary Runtime Source)
  • CMMS (Embedded Health Context)
  • YMS (Task Execution Context)

Proof model

Feature-level proof

  • Yard Throughput and Shift Oversight (YMS) scope is defined in product module catalog.

    verified

    docs/products/tower/product.md · Module Catalog > Yard Throughput and Shift Oversight (YMS)

  • Tower driver oversight and cockpit workflows are implemented in dedicated portal pages and hooks.

    verified

    docs/products/tower/product.md · Module Catalog > Driver Cockpit Dashboard

    Code: frontend/apps/portal/src/products/tower/pages

    Contract: proto/tms/loads/v1

  • Tower oversight surfaces are implemented in portal product modules.

    verified

    docs/products/tower/product.md · Module Catalog > Load and Stop Oversight

    Code: frontend/apps/portal/src/products/tower

    Contract: proto/tms/loads/v1

Solution routes that reuse this feature

Open these solution and feature-map routes to test this behavior in end-to-end buyer workflows (0).

This feature is currently not linked to a named solution route. Review this behavior directly, then validate continuity through adjacent solution and feature-map routes.

Continuity routes for this capability

Route-level continuity checks where this feature appears in product-pair workflows.

This capability is currently mapped in adjacent solution and continuity routes. Browse linked solution routes first, then return here when cross-route continuity is expanded.