YMS: Analytics
Yard Utilization %: Current occupancy / total capacity Dock Turn Time: Average time trailer spends at dock door Dock Performance by Door: Per-door analytics...
Capability
How it works
- 1 Yard Utilization %: Current occupancy / total capacity
- 2 Dock Turn Time: Average time trailer spends at dock door
- 3 Dock Performance by Door: Per-door analytics — avg turn time, utilization %, common delay reasons, equipment...
- 4 Gate Throughput: Vehicles checked in/out per hour
Operational outcomes
- Yard Utilization %: Current occupancy / total capacity
- Dock Turn Time: Average time trailer spends at dock door
- Dock Performance by Door: Per-door analytics — avg turn time, utilization %, common delay reasons, equipment...
Integration boundaries
- Ownership Realignment Program (Crew + CMMS)
- Crew Integration Summary (Mirrored)
- Sites & Zones
Proof model
Feature-level proof
Analytics scope is defined in product module catalog.
verified
docs/products/yms/product.md · Module Catalog > Analytics
YMS gate operation execution is implemented with dedicated gate rule modules and geofence-ready integrations.
verified
docs/products/yms/product.md · Module Catalog > Gate Operations
Code: backend/services/yms/internal/modules/gates
Contract: proto/yms/gates/v1
YMS gate execution is implemented in dedicated gate modules.
verified
docs/products/yms/product.md · Module Catalog > Gate Operations
Code: backend/services/yms/internal/modules/gates
Contract: proto/yms/gates/v1
Solution routes that reuse this feature
Open these solution and feature-map routes to test this behavior in end-to-end buyer workflows (1).
Yard throughput
Outcome: Site execution is coordinated through shared gate, dock, and appointment workflows.
Gate, dock, and appointment behavior stays coordinated when yard workflows are linked to dispatch context.
Continuity routes for this capability
Route-level continuity checks where this feature appears in product-pair workflows.
Detention Detection
Formula: YMS -> TMS
Open continuity routeDock-to-Load Sync
Formula: TMS <-> YMS
Open continuity routeHealthy Yards
Formula: CMMS + YMS
Open continuity routeOperational validation path
Use adjacent feature and solution routes to inspect how this capability participates in cross-product execution.